| Plant
and Description of Work
|
 |
New
York Power Authority, Lewiston Pump Storage Plant, Various Units,
(Mar 2001 Dec 2002)
Investigate torsional vibration and shaft coupling problems, design
new coupling system, oversee installation and conduct testing to evaluate
repair. |
|
 |
New
York Power Authority, St Lawrence Generating Station,
(July 2001 Present)
Design and supply precision turn-key wicket gate line boring tooling
system. System allows increased throughput and higher accuracy boring
results. |
|
 |
New
York Power Authority, Robert Moses Station, Unit 12
(Jan 2001-Mar 2001)
Assist with rotor reshrink. Develop methods to accomodate rotor rim
slew for reshrink |
|
 |
New
York Power Authority, Robert Moses Station, Several Units (Jan 2001-Present)
Qualification of as found component conditions, optical alignment
of rotating parts, development and implementation of rotor rim retensioning. |
|
 |
New
York Power Authority, St. Lawrence G.S. , All Units
(Sep 2000 - Jun 2001)
Design and supply of an optical rotor sweep arm to ensure rotor concentricity
&
circularity during rim reshrink. |
|
 |
US
Air Force, Eielson Air Force Base, Unit N3 Turbine-Generator (Jun
2000 - Jul 2001)
Diagnose cause of rotor collision on a direct coupled steam turbine.
Supervise repair and realignment of unit. Tune governor and steam
extraction systems. |
|
 |
GPU
Energy - York Haven Generation Station (Mar 2000 - Present)
Assist in development of a specification for new right angle bevel
gear drives.
Evaluate potential vendors and proposals. |
| |
|
|
|