The Force that Goes the Distance Everytime....

Services

Balancing
Bearing Design and Troubleshooting
Computational Fluid Dynamics
Computer Aid Design (CAD)
Condition Assessment
Design Review
Diagnostic and Troubleshooting
Electromagnetic Analysis
Engineering and Scientific Consulting
Equipment Appraisal & Due Dilligence
Forensics and Failure Anaysis
Instrumentation
Machinery Alignment
Materials Characterization
Numeric Modeling
Optical Alignment
Performance Testing
Power Systems Network
Reverse Engineering
Rotordynamics
Specification Development
Technical Education
Test and Inspection
Tribology & Lubrication
Vibration Analysis

Machinery
AC Motors / Generators
Bearings
Control Systems
DC Motors / Generators
Electric Winding and Electrical Insulation Systems
Gas Turbines
Gears and Geared Drives
Generator/Motor Excitation Systems Drives
Governors
Hydroelectric Generators
Hydroelectric Turbines
Instrumentation and Monitoring Systems
Laser and Optical Apparatus
Mine Hoists
Pump Storage
Steam Turbines
Variable Speed Drives

Search Power Engineering

 

 

Plant and Description of Work
Chelan County Public Utility District, Rocky Reach Dam
(Feb 2000 - Feb 2001)

Design and implementation of a new rim support system. Design tooling and procedures for rotor rim reshrink. Supervise reshrink

National Steel and Shipbuilding Company (NASSCO)
(Dec 1999 - Mar 2000)

Measurements to diagnose source of seal leakage in large variable pitch propellor hub. Recommend repair program to eliminate leakage

Kinder Morgan (Feb 2000 - Jun 2000)
Troubleshoot and support repair of an induction motor for use in a natural gas
transmission compressor station.

Virginia Power, Bath County Pump Storage Station, Unit N6
(Oct 1999 - Feb 2000 )

Thrust bearing failure diagnosis and repair recommendations.

Robert Bein, William Frost, Several Stations (Sept 2000 - Jun 2002)
Specify double wall heat exchangers for external bearing heat exchangers. Perform commissioning tests to verify system performance.

Great Lakes Power, MacKay Unit N1 (Sep 1999 - Feb 2000)
Thrust bearing failure investigation and hydraulic thrust measurements

New York Power Authority, Robert Moses Station, Unit N1
(Jul 1999 - Dec 1999)

Thrust bearing failure investigation. Shaft current identification and mitigation.

US Generating, Bear Swamp Pump Storage Station, Units 1 & 2
(Nov 1998 - Dec 1999)

Vibration assessment, stationary and rotational alignment, dynamic balancing. Thrust bearing evaluation and improvement. Protection system and instrumentation redesign. Diagnosis of turbine hydraulic instability.

New York Power Authority, Robert Moses Station, All Units (Jan 1999)
Tribological study to determine optimum materials for rotating and stationary turbine seals. Issue formal white paper with findings and recommendations.

Generation Equipment Services Gas Turbine Gearbox
(Oct 1998 - Jan 1999)

Diagnose gear tooth failures and gearbox misalignment. Recommend and implement repairs. Improve gearbox lubrication and filtration.