The Force that Goes the Distance Everytime....

Services

Balancing
Bearing Design and Troubleshooting
Computational Fluid Dynamics
Computer Aid Design (CAD)
Condition Assessment
Design Review
Diagnostic and Troubleshooting
Electromagnetic Analysis
Engineering and Scientific Consulting
Equipment Appraisal & Due Dilligence
Forensics and Failure Anaysis
Instrumentation
Machinery Alignment
Materials Characterization
Numeric Modeling
Optical Alignment
Performance Testing
Power Systems Network
Reverse Engineering
Rotordynamics
Specification Development
Technical Education
Test and Inspection
Tribology & Lubrication
Vibration Analysis

Machinery
AC Motors / Generators
Bearings
Control Systems
DC Motors / Generators
Electric Winding and Electrical Insulation Systems
Gas Turbines
Gears and Geared Drives
Generator/Motor Excitation Systems Drives
Governors
Hydroelectric Generators
Hydroelectric Turbines
Instrumentation and Monitoring Systems
Laser and Optical Apparatus
Mine Hoists
Pump Storage
Steam Turbines
Variable Speed Drives

Search Power Engineering

 

 

Plant and Description of Work
New York Power Authority, Robert Moses Station, Units 10 &13
(Sep 1998 - Dec 1998)

Troubleshoot and realign voltage regulator to solve instability and synchronizing problems.

Abitibi Price, Grand Falls Power Station, Unit 5 (Aug 1998 - Dec 1998)
Horizontal machine train stationary and rotational realignment.

New York Power Authority, Robert Moses Station, Unit 6
(Jun 1998 - Oct 1998)

Failure Analysis and Safety Investigation to identify and remedy source of a potentially
life threatening electrical equipment fire.

  Miede & Sexton (Jun 1998 - Jul 1998)
Forensic analysis of failed marine propulsion gear. Results of analysis used in legal proceedings.

  Electronics Manufacturer (Apr 1998 - Sep 1998)
Tribological and chemical studies to diagnose and resolve material compatibility issues.

  Electronics Manufacturer (Apr 1998 - Sep 1998)
Forensic studies and reports to evaluate and diagnose ball bearing failures.

  Electronics Manufacturer (Apr 1998 - Sep 1998)
Design and build test instrumentation to measure in situ loads on miniature bearings in their assembly. Modify machinery design to reduce bearing loads

Algonquin Power, Campbellford Power Station, Units 1 & 2
(Apr 1998 - May 1999)

Diagnose gear tooth failures and gearbox condition. Review and recommend repairs and improvements to gearbox filtration.

Great Lakes Power, Andrews Generating Station, Unit N2
(Oct 1997 - Nov 1997)

Align and balance Unit. Design changes to thrust runner to improve lift oil system performance

Manitoba Hydro, Grand Rapids, Units 1 thru 3 (Aug 1997 - Feb 1998)
Tribological and forensic studies to diagnose root cause of oscillating bushing wear and failures. Redesign bushing oil grooves and feed to maximize lubricant effectiveness and flushing capability. Investigate thrust loading and turbine blade mechanism design capability. Lubrication research to determine optimum lubricant for application.